Skip to content
NexusMortgageOS

Onboarding

The 30-day production pilot

A structured way for a mortgage company to prove NexusMortgageOS on real loans — with migration done for them, measurable targets, and a clean exit if it doesn't deliver.

Time to first live loan

14 days

typical

Migration cost

$0

during pilot

Commitment

None

export and leave anytime

Parallel running

Expected

never a hard cutover

Week-by-week plan

What we do, and what we need from you

Days 1–3
Workspace & people
  • Tenant created, branding applied, billing contact set
  • Roles mapped: LO, processor, underwriter, closer, admin
  • MFA enforced for admins, seat plan confirmed
  • Kickoff call: name one executive sponsor and one power user
Days 4–10
Data migration
  • Export from Encompass / Byte / spreadsheet into the migration wizard
  • Field mapping reviewed with your processor, not just IT
  • Active pipeline loaded first; closed-loan history loaded second
  • Reconciliation report: record counts, dollar totals, missing docs
Days 8–14
Vendor connections
  • Your credit vendor, AUS, e-sign and doc-prep credentials sealed in the vault
  • Live verification harness run against every credential
  • Go-live readiness board must be green before the first live file
  • Fallback plan documented for any vendor not yet contracted
Days 12–21
Run live loans
  • Start with 5–10 real files in parallel with your current system
  • Workflow rules tuned to your actual condition set
  • AI agents run in review mode: every output human-approved
  • Daily 15-minute standup with your success contact
Days 22–30
Decision
  • Metrics reviewed against the baseline captured in week 1
  • Parallel running dropped for teams that hit target
  • Compliance sign-off: disclosure timing, audit trail, access review
  • Convert, extend, or export and walk away — your call

Success metrics

Baselined in week 1 so the result isn't a matter of opinion

MetricBaselineDay-30 target
Touches per fileCaptured week 140% fewer
Application to CTCYour current median≤ 11 days
Conditions cleared per dayPer processor2× baseline
Disclosure timing exceptionsYour last 90 daysZero

Miss the targets and we extend the pilot at no cost or help you export — we don't invoice a pilot that didn't work.

What we commit to

In writing, before kickoff

  • No per-loan or per-funded-file fees during or after the pilot.
  • Migration and configuration work is performed by us, not billed hourly.
  • Your data is exportable in machine-readable form at any time, including on the day you leave.
  • No auto-conversion: the pilot does not roll into a paid subscription unless you say yes in writing.
  • Parallel running is expected — we never ask you to shut off your system of record on day one.

Exit criteria

How a pilot ends, either way

Convert

Targets met and compliance signed off. Your pilot workspace becomes your production workspace — no re-migration, no data reload. Billing starts on the first of the following month.

Walk away

Full export of loans, documents and audit history in machine-readable form within 5 business days, workspace deleted on your confirmation, and nothing owed.

Apply for a pilot seat

Limited cohort — we onboard a small number at a time so migration gets real attention

No card required. No auto-conversion.