Module 10 · Test Drive & Migration
Prove it before you switch
A pre-loaded sandbox your team can drive today, a live migration simulator against Encompass and LendingPad exports, and a concierge path handled end-to-end by the NexusMortgageOS team.
Sandbox loans pre-loaded
18 files
messy docs included
Typical migration
4 days
legacy: 7–20 weeks
Field mapping coverage
96%
auto-mapped
Concierge cost
$0
included in onboarding
Watch the 24-second walkthrough
Prefer to watch instead of click? This is the whole loan journey, end to end — with voice-over.
Side-by-side task race
Same job of work, NexusMortgageOS versus the system you use today
NexusMortgageOS
6.0 min · 4 clicks- Borrower texts the intake link
- Conversational agent asks 9 adaptive questions
- Credit, income and asset pulls fire automatically
- 1003 assembled, validated and filed
Encompass
38 min · 118 clicks- LO schedules a call, opens blank 1003
- Manual keying across 7 tabbed screens
- Re-key borrower data into credit vendor
- Save, re-validate, fix 11 field errors
- Email doc request list manually
Time saved
32 min
Clicks removed
114
Speed multiple
6.3×
Bring your data over — watch it happen
Pick the system you run today and run a simulated migration end to end
What we pull in
- Loan folders (.em)
- Custom field templates
- eFolder documents
- Milestone history
Records
0
NexusMortgageOS
6 hrs
Legacy switch
11 wks
Auto-mapped fields · 98% coverage
- LoanNumberloans.loan_numberauto
- Borr_FullNameloans.borrowerauto
- LoanAmt_Baseloans.amountauto
- NoteRateloans.rateauto
- LTV_Calc / CLTVloans.ltvderived
- MilestoneCurrentloans.stagemapped
- CondText_1..nloan_conditions.titleexpanded
- AuditTrailEntryaudit_events.actionhash-chained
Read-only credentials, nothing written back
Migration time-delta calculator
Watch legacy records map in real time
NexusMortgageOS elapsed
0.0s
Records ingested
0
Legacy equivalent
0.0 wks
Interactive test drive
No account, no sales call
White-glove support hub
Concierge path, owned by us
- Scheduled
Kickoff call
NexusMortgageOS migration lead · Day 0
- Automated
Legacy export + field mapping
NexusMortgageOS engineering · Day 0–1
- Guided
Parallel-run validation
Joint team · Day 2–4
- Included
Team enablement workshops
NexusMortgageOS success · Day 5
- Included
Cutover + hypercare (30 days)
Dedicated pod · Day 6+